Bioreactor and fermenter LAMBDA MINIFOR: Installation guide
0 (0 Likes / 0 Dislikes)
Lambda Minifor Fermenter-bioreactor Installation guide
peristaltic pump support
sterile sampling device holder
reaction vessel holder
LAMBDA PEEK double-seal tubing connector
agitator assembly
air input filter
pH probe
pO2 (DO) probe
pO2 (DO) probe
pH probe
over-pressure security valve
sampling and addition ports
cooling loop
out-gas condenser with output filter
blind stoppers for unused ports
sterile sampling device
sampling port
acid/base/medium addition port
connection of cooling water to the cooling loop
connection of cooling water to the outgas condenser
connection of air supply
connecting the medium (sampling cannula) to ground
connecting the agitation (mixer) unit
connecting the base and acid pump
connect fermenter-bioreactor to mains
tubing insertion into the peristaltic pump
for probes and pump CALIBRATION see the corrensponding videos
connect acid pump to 'ACID'
connect base pump to 'BASE'
LAMBDA Minifor fermenter-bioreactor preparation for sterilization
preparation for STERILIZATION remove grounding cable
preparation for STERILIZATION remove agitation (mixer)
preparation for STERILIZATION
preparation for STERILIZATION disconnect pO2 probe connector
preparation for STERILIZATION
preparation for STERILIZATION disconnect pH probe connector
preparation for STERILIZATION
preparation for STERILIZATION remove reagent bottles from magnetic bottle holders
preparation for STERILIZATION remove syringe pump from sterile sampling device (all tubing clamps closed)
preparation for STERILIZATION all tubing lines and air input line are clamped for sterilization except the air output line with the outgas condenser and output filter
Lambda Minifor Fermenter-bioreactor Installation guide